Interior bathroom demolition costs $1,000 to $2,300. Prices can go higher if you’re removing and moving walls to create a different footprint. For the experienced DIYer, this is a good place to save money by doing it yourself or assisting the contractor. However, demo can get expensive quickly if you take out a load bearing wall, cut electrical lines or break a water pipe. Avoid the risk by hiring a pro.
I have a miserably small master bath with a particle board subfloor (house built 1969), so I must guy it. I bought toilet made for small bathrooms, and plan to pull the cabinet sink, replace with pedestal, raise storage like lighted bulkhead, demolish tile, and widen doorway from 28" to 32". I might gain 6" from tile removal alone, plus but another 6" on entrance with cabinet sink removal. Since large expense is in demolition, I could do that. But, install showers is tricky given the drain leveling so I'll hire a pro for that. Question: gutting, updating and repairing master bath is necessary, but to what extent should I go i, terms of resizing, which would entail bumping out wall into adjoining small room, which then adds expense of finishing that where window placement restricts encroachment. It's a nice older brick house that I bought before I realized the made of lapses and oversights by the home inspector (who also is a local top police official in a town with highly subjective law enforcement). I need to fix, list, well and leave. Any thoughts (and prayers much appreciated).
As the home owner, I am providing about $8,000 in materials. This includes the cabinetry, fixtures, faucets, countertops, lighting, toilet, glass in-line shower door and tile. Received two quotes. One contractor wants $25,000 to demo the bathroom, convert the existing tub to a tiled walk-in shower, tile the floor, and install my materials. The other wants $27,000. Using the previously mentioned 60/40 labor to material rate, I would be paying more than double for labor...that's insane. Some contractor's need a reality check.
I can't even get anyone to look and give an estimate to complete a bathroom remodel- just the bathtub/shower part has to be done as the last person who was doing it died- the rest is complete and have all the items and materials already and paid for. once they hear that they are no longer intrested- what do they expect? me to let them rip out what was already done and repay and redone everything all over again so they get more money? and throw out brand new imported Travertine and Spanish tile?
For a small bathroom of roughly 100 square feet, labor costs could run an average of $12,000 or $13,000 on the high end. This would include the labor to completely redo tile, completely install new fixtures, complete any necessary wiring and plumbing, and have everything inspected afterward. Never overlook the importance of having your wiring and plumbing inspected directly after the contractors finish. This can end up saving you a lot of money on repairs in the long run.
If you want a small addition that can improve your bathroom in a big way, consider buying and installing a bath fan. This will reduce humidity in the room, eliminate odors and remove moisture from the air. If you already have a bath fan and the wiring is in place, then you can expect to pay a very reasonable $150 for the installation work. If there is no current space for the fan, however, your cost might be closer to $800.
It's totally legitimate for a professional to charge you for a design, at least in some situations. If the contractor has a book of ready-made designs and just pulled one out to show you, then you're right that s/he shouldn't charge you. But if someone does a design that conforms to your room's dimensions, with the features that you want, then that person has invested time in creating a work product. Some contractors and architects think that's just the cost of doing business, but many others consider that their time is worth something, and they charge for it. You just need to let contractors know that you're not looking for that kind of custom work, and not willing to pay for it.
My so lives in the middle floor of a three story condo building. A few weeks ago, the bathtub drain in the unit above his condo broke and water flowed down the inside of the walls soaking the drywall and destroyed two of the three walls in his tub/ shower unit. I need to estimate the cost of repair in order to make a claim. I have already torn all the walls down to the studs and had a tub surround installed.
One client may want vinyl flooring and another may want heated floors with custom tile. Do you want a custom shower the most costly or a tub with tile on the walls? Solid surface counters, high-end fixtures or big box quality. Small 5x7 bathrooms can cost almost as much as a larger bathroom. The time to properly build a watertight custom shower is the same regardless of how big a room is or how much your home is worth. Have it done right rather than choose the lowest cost contractor. A years from now when your shower is still working perfectly you will be glad you spent a little more and gave your contractor the time to do excellent work. VInce
The prices you quote do not come close to the prices paid in Chicago. Much depends on the cost of labor and whether the unit is in a high rise. The cost of a licensed plumber to do the simplest task can easily be more than $1000 and often is twice that. Labor has also skyrocketed this year in Chicago due to immigration policy. in addition, any changes in locations in a bathroom, turning a shower into a built in and converting the tub to shower, dramatically raise prices.

The cost of your project will be tied to a number of factors including the room size and the quality of materials including the grade of fixtures, cabinets and finishes. Bathroom vanities often eat up the majority of the materials budget. Whether a change to the floorplan is involved will also determine the ultimate cost of your master bath remodel.


Now, we can jump into factors you can and should control throughout this adventure. No matter what house project you're undertaking, whether it be DIY or not, you need to have a budget. Before the project begins, you need to have a range, if not know exactly, of what you can spend on every little aspect. That means setting a number for your new cabinet hardware, shower head, shower stall, glass shower door or even material delivery and sticking to it.

And then the apples to bananas procedure of reviewing non-like proposals is just as frustrating. Some bring everything. From the paint to the tile to the fixtures and cabinetry. Others point you in you’re own direction for each of these and expect you to know what questions to ask when buying never-before, behind the scenes purchases that are required for a bathroom remodel. And you’re expected to review the costs a la carte vs as a package and come to a whole conclusion as soon as possible ‘cause if you want the remodel done in 5 months, we have to start in 3 and we’re booked for the next 6...wait, what??!?!?
×