Installing a new bathtub is one of the more complicated and expensive projects involved in a bathroom remodel. Not only will you have to purchase the tub itself, you also need to install surrounds and have a plumber come by for the installation work. If you're just replacing the tub, and the surround can stay, your price will be lower than average. If you're having a customized surround built, expect to pay around $3,160.
Wall and Floor Tile: Ceramic, porcelain and natural stone are popular picks for floor tile in bathrooms. Materials will be the deciding factor here, but natural stone often costs more to install because it is difficult to cut and place. From natural stone and classic ceramic to glass and mosaic styles that mimic natural materials, wall tile options vary.

Wall and Floor Tile: Ceramic, porcelain and natural stone are popular picks for floor tile in bathrooms. Materials will be the deciding factor here, but natural stone often costs more to install because it is difficult to cut and place. From natural stone and classic ceramic to glass and mosaic styles that mimic natural materials, wall tile options vary.


The cost of your project will be tied to a number of factors including the room size and the quality of materials including the grade of fixtures, cabinets and finishes. Bathroom vanities often eat up the majority of the materials budget. Whether a change to the floorplan is involved will also determine the ultimate cost of your master bath remodel.
The remodel is needed due to water leakage from the tub surround into the wall cavity. I recommended she get an estimate of extra costs that cannot be foreseen until demolition occurs but would be entailed if the contractor has to do any structural work like putting in new studs and or has to install new insulation. I urged her to get at least an upper ceiling estimate before work begins lest the contractor make her an offer she can't refuse once the room is gutted. I urged her to be flexible on any adjustment to the estimate that can be made only after demolition begins. But I told her to insist that the rest of the estimate be binding. No surprises.

And then the apples to bananas procedure of reviewing non-like proposals is just as frustrating. Some bring everything. From the paint to the tile to the fixtures and cabinetry. Others point you in you’re own direction for each of these and expect you to know what questions to ask when buying never-before, behind the scenes purchases that are required for a bathroom remodel. And you’re expected to review the costs a la carte vs as a package and come to a whole conclusion as soon as possible ‘cause if you want the remodel done in 5 months, we have to start in 3 and we’re booked for the next 6...wait, what??!?!?


Additions & RemodelsAcoustic CeilingsArchitectureCarpentryCarpet CleaningCleaningDecks & PatiosDemolitionDesignersDoorsDrywall & InsulationElectricalEngineeringFencingFlooringGaragesGlass & MirrorsGuttersHandymanHome SecurityHome TheaterHome BuilderHome InspectorsJunk RemovalHVACLandscapingMasonryPainting & StainingPavingPest RemovalPlumbingRoofingSidingSnow RemovalSolarSwimming PoolsTesting & AbatementTile & StoneTree RemovalWindows
I’m in the middle of a small bathroom remodel. Shower only-no tub. I thought I was ready for this, but so many things have come up I didn’t count on. I paid $5000 for all supplies and in stock fixtures at Lowes–just basic stuff. I did have to order a shower kit because the builder thought it would save some labor time. It was high–$3200. The builder charges $50 an hour (includes him and his helper). He estimated his costs between 5 and 7 thousand. My house is 35 years old so he has had to do a lot of work to accommodate the new fixtures. I had an old lighted medicine cabinet so he had to rewire for the new lights. My vanity was too high so he had to move the electrical outlet. Because my attic above the shower had moisture in it, he had to vent the shower to the outside. He had to replace all the subflooring and a lot of the rotted insulation on the sides of the bathroom (leaky roof) . Anyway, it looks like my bathroom remodel is going to be around 10 or 11 thousand. I wish now I hadn’t ordered the shower kit with the fancy tile.
×