I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.
I agree with everything you said. I think the trick is to convey those concerns when discussing what work will be needed. Everyone will have concerns but if you come across as too needy or pushy they may think you will be a pain in the butt homeowner. I have seen this before where you have to come back 3 or 4 times for something not dealing with the work, but you are trying to be polite and helpful for business. Word of mouth is the best way to get more buisness, in my opinion.
Interior bathroom demolition costs $1,000 to $2,300. Prices can go higher if you’re removing and moving walls to create a different footprint. For the experienced DIYer, this is a good place to save money by doing it yourself or assisting the contractor. However, demo can get expensive quickly if you take out a load bearing wall, cut electrical lines or break a water pipe. Avoid the risk by hiring a pro.
I can't even get anyone to look and give an estimate to complete a bathroom remodel- just the bathtub/shower part has to be done as the last person who was doing it died- the rest is complete and have all the items and materials already and paid for. once they hear that they are no longer intrested- what do they expect? me to let them rip out what was already done and repay and redone everything all over again so they get more money? and throw out brand new imported Travertine and Spanish tile?

While it's easy to replace a light or faucet at a later date, you should have your contractor do the larger tasks at the same time. If you plan to replace the tub and install tile floor, it's best to do that all at once. You may save on labor charges if they can do a few tasks in one day instead of doing these tasks on separate days a few months apart.

Hiring a plumber and skilled workers for important tasks is a must to make the planned new bathroom well-fit. Other than that, you can actually save money if you do minor tasks as mentioned before. In addition to those assignments, you can paint the newly-redesigned bathroom. You can work together with your wife to decorate it. Or you can even invite your children to select which items to be put in it.
It's so competitive out there. I am a Long Island contractor and I be realized lately that clients give you an impression when you give them there costs that you are doing something wrong. I've been in this Busines about 20 years and that avg cost is right there. Also homeowners should also realize if us contractors are using subs for our plumbing and electrical our costs are hire than the guy doing all the work himself. I only used licensed contractors for all my remodeling work.
Another step is repainting the planned new bathroom. Choose soft and bright colors that will be suitable for children’ eyes. Presenting before their eyes a nice bathroom will hopefully invite them going to bath regularly. This is important as not all children are disciplined taking a bath. Some parents are quite dizzy asking for their kids cleaning their dirty bodies in bathroom.
I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.

I have a miserably small master bath with a particle board subfloor (house built 1969), so I must guy it. I bought toilet made for small bathrooms, and plan to pull the cabinet sink, replace with pedestal, raise storage like lighted bulkhead, demolish tile, and widen doorway from 28" to 32". I might gain 6" from tile removal alone, plus but another 6" on entrance with cabinet sink removal. Since large expense is in demolition, I could do that. But, install showers is tricky given the drain leveling so I'll hire a pro for that. Question: gutting, updating and repairing master bath is necessary, but to what extent should I go i, terms of resizing, which would entail bumping out wall into adjoining small room, which then adds expense of finishing that where window placement restricts encroachment. It's a nice older brick house that I bought before I realized the made of lapses and oversights by the home inspector (who also is a local top police official in a town with highly subjective law enforcement). I need to fix, list, well and leave. Any thoughts (and prayers much appreciated).

Between the two options, pick up one tile design that suits your necessity and budget. Remember to put forward safety for your children in this point. In case your budget is limited, you can partially change the tile. Determine which part of the bathroom that needs new, safer tiles. This will definitely save more money compared to overall tile changing.
×