I’m mostly done with a renovation on a small bathroom with a tub. Once I knew what was staying what was going that made figureing the costs much easier. Estimated costs for everything I would need for almost a year. I budgetted about $1,800. I figure I have another $500 in expenses to finish. Saved alot on doing most of the work and hiring for the electrical and plummbing. Hint, if you make the problem assesible it makes the job cheaper.
Interior bathroom demolition costs $1,000 to $2,300. Prices can go higher if you’re removing and moving walls to create a different footprint. For the experienced DIYer, this is a good place to save money by doing it yourself or assisting the contractor. However, demo can get expensive quickly if you take out a load bearing wall, cut electrical lines or break a water pipe. Avoid the risk by hiring a pro.
The remodel is needed due to water leakage from the tub surround into the wall cavity. I recommended she get an estimate of extra costs that cannot be foreseen until demolition occurs but would be entailed if the contractor has to do any structural work like putting in new studs and or has to install new insulation. I urged her to get at least an upper ceiling estimate before work begins lest the contractor make her an offer she can't refuse once the room is gutted. I urged her to be flexible on any adjustment to the estimate that can be made only after demolition begins. But I told her to insist that the rest of the estimate be binding. No surprises.
However, if you plan to add more square footage to your bathroom, that's where the expenses can really add up. Expanding the size of an existing small bathroom increases the total cost of a bathroom renovation project and lengthens the job's timeline. Some expansions may require permits, too, which may cost an additional fee and take time to secure.
And then the apples to bananas procedure of reviewing non-like proposals is just as frustrating. Some bring everything. From the paint to the tile to the fixtures and cabinetry. Others point you in you’re own direction for each of these and expect you to know what questions to ask when buying never-before, behind the scenes purchases that are required for a bathroom remodel. And you’re expected to review the costs a la carte vs as a package and come to a whole conclusion as soon as possible ‘cause if you want the remodel done in 5 months, we have to start in 3 and we’re booked for the next 6...wait, what??!?!?
×