Now, we can jump into factors you can and should control throughout this adventure. No matter what house project you're undertaking, whether it be DIY or not, you need to have a budget. Before the project begins, you need to have a range, if not know exactly, of what you can spend on every little aspect. That means setting a number for your new cabinet hardware, shower head, shower stall, glass shower door or even material delivery and sticking to it.
Home improvement digital marketplace HomeAdvisor, which connects homeowners with service professionals, estimates a comprehensive bathroom remodel at $15,000 or more. A large master bath remodel in a luxury home can weigh in at over $50,000. The average homeowner can expect to pay $18,000 says HomeAdvisor for a complete master bath renovation which typically includes a separate tub, shower, double vanity and larger space for cabinets and fixtures.
A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away.
There are so many beautiful things to notice about this bathroom that it's hard to know where to start. The concrete sink? The wallpaper? The sconce lighting? The tarnished mirror on the door, reflected in the main mirror? The barely-there ultra-modern faucets? Whatever you notice first, though, you can't but admit that this space is a masterpiece.
Some homeowners love pedestal sinks. Others still like the feel of carpet near the sink. We can not change our personal taste and as such, it must be considered throughout any bathroom remodeling project. Therefore, don’t be afraid to throw in a personal touch or two. If you want an orange accent wall, go for it. Just remember, you may have to paint over it the day it comes time to sell.
We’ve had a number of contractors to our house for a number of items from roof tear off & redo, to gutters and corner boards, whole-house carpet replacement and a basement completion. We know the lingo and the big picture but - whether it’s the timing or the unknown - this has been the most frustrating process ever! If you find a nuts & bolts, studs to baseboards and crown-molding to carpet contractor you can trust, consider yourself one of the lucky 10 across the country. The rest of us are stuck in the wild-west and unfortunately left with an article that’s not even worth updating over the past 2+ years.
If you were gutting your entire bathroom, contractors and experts say showers should account for one-third of the total remodeling cost. Furthermore, unlike your bathroom flooring, there are a few elements in play when considering a shower remodel. After all, you have to decide on a shower head, shower door and shower stall. All in all, a new shower typically costs approximately $2,800.
One client may want vinyl flooring and another may want heated floors with custom tile. Do you want a custom shower the most costly or a tub with tile on the walls? Solid surface counters, high-end fixtures or big box quality. Small 5x7 bathrooms can cost almost as much as a larger bathroom. The time to properly build a watertight custom shower is the same regardless of how big a room is or how much your home is worth. Have it done right rather than choose the lowest cost contractor. A years from now when your shower is still working perfectly you will be glad you spent a little more and gave your contractor the time to do excellent work. VInce
I’m mostly done with a renovation on a small bathroom with a tub. Once I knew what was staying what was going that made figureing the costs much easier. Estimated costs for everything I would need for almost a year. I budgetted about $1,800. I figure I have another $500 in expenses to finish. Saved alot on doing most of the work and hiring for the electrical and plummbing. Hint, if you make the problem assesible it makes the job cheaper.

A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away.
Between the two options, pick up one tile design that suits your necessity and budget. Remember to put forward safety for your children in this point. In case your budget is limited, you can partially change the tile. Determine which part of the bathroom that needs new, safer tiles. This will definitely save more money compared to overall tile changing.

Home improvement digital marketplace HomeAdvisor, which connects homeowners with service professionals, estimates a comprehensive bathroom remodel at $15,000 or more. A large master bath remodel in a luxury home can weigh in at over $50,000. The average homeowner can expect to pay $18,000 says HomeAdvisor for a complete master bath renovation which typically includes a separate tub, shower, double vanity and larger space for cabinets and fixtures.
As a contractor I can tell you that most reputable contractors probably don't need your job, and if you make things too complicated or troublesome, they will move on to other jobs that don't throw up red flags. Much of what you ask for here is reasonable, but bringing a second contract into the equation can set of some alarms that you may be a difficult customer to work with or even a litigiously minded person who is likely to try and bring a lawsuit whether deserved or not. Anything you want covered should be in the original contract.
New to this site. My first thought is to the "DIY throw a bathroom together in a weekend" comment makers. Your comments about how much it cost you 2,000 to do a bathroom in your home correctly or incorrectly without a picture of the finished product is invalid in this forum. I had a customer spend 2k on a complete vanity, dumb comment. Second, I've agreed to the home owner supplying all the materials (one time mistake) and it was a total disaster after getting into the project. We know what we need when we go for supplies....plain and simple. A homeowner that purchases materials for a remodel they CAN'T handle for a contractor that CAN complete the task is like a mechanic ordering a transmission for a rear brake job....irresponsible. A good contractor listens to his customers, is given a budget, and decides if it is profitable for his company. If we give you a $7,000 price for a bathroom and you think it should be done for $5,000, I encourage the customer to get 2 more bids. I have faith in the quality of work I do, and if the customer doesn't see that from the very beginning, the transaction will be a nightmare. "JOE" your comment stuck out because its the unseen labor hours of modifying the old to fit the new that customers don't and will not ever understand. If you want something done right in your beautiful home, have the money set aside and then hire a contractor you trust to make your happy.
I’m in the middle of a small bathroom remodel. Shower only-no tub. I thought I was ready for this, but so many things have come up I didn’t count on. I paid $5000 for all supplies and in stock fixtures at Lowes–just basic stuff. I did have to order a shower kit because the builder thought it would save some labor time. It was high–$3200. The builder charges $50 an hour (includes him and his helper). He estimated his costs between 5 and 7 thousand. My house is 35 years old so he has had to do a lot of work to accommodate the new fixtures. I had an old lighted medicine cabinet so he had to rewire for the new lights. My vanity was too high so he had to move the electrical outlet. Because my attic above the shower had moisture in it, he had to vent the shower to the outside. He had to replace all the subflooring and a lot of the rotted insulation on the sides of the bathroom (leaky roof) . Anyway, it looks like my bathroom remodel is going to be around 10 or 11 thousand. I wish now I hadn’t ordered the shower kit with the fancy tile.
×