As I contractor if I am installing a customers product or supplying my own, I am charging full overhead and profit above the install cost. I try not to allow customers to supply materials and when they do I tack on my overhead and profit in to the labor. Remodeling is one of the most time consuming services and if your not covering your overhead and profit in the materials and labor you will not last long in this business. At the end of the day after all said and done, making a 15% profit is respectable. Think about it, your the designer, the gofer, the physiatrist, the builder, shopper and the banker until you get paid. Never be intimidated to support your price, deliver a quality product and support it with proper pricing. Never let the customer supply there own materials. Movie theaters don't let you bring in your own pop corn, so why should contractors be any different.
It's so competitive out there. I am a Long Island contractor and I be realized lately that clients give you an impression when you give them there costs that you are doing something wrong. I've been in this Busines about 20 years and that avg cost is right there. Also homeowners should also realize if us contractors are using subs for our plumbing and electrical our costs are hire than the guy doing all the work himself. I only used licensed contractors for all my remodeling work.
Yeah, I feel your pain. I'm in Alabama, one of the lowest income states in the country, and I got a quote from a "big box" hardware store here. $39,000 -- to remodel a 9 x 12 bathroom. I won't go into the details but I'll tell you that the estimate included $3600 for electrical work. Uhh, we are simply switching out 2 'regular' outlets and putting in $20-dollar GFI outlets. The wiring is fine (I know because I've been in the wall before). So don't go to the "big box" stores unless you want the highest possible estimate (oh, yeah ... I had to pay for the estimate as well).
I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.
Between the two options, pick up one tile design that suits your necessity and budget. Remember to put forward safety for your children in this point. In case your budget is limited, you can partially change the tile. Determine which part of the bathroom that needs new, safer tiles. This will definitely save more money compared to overall tile changing.
If someone was to come at us with their own additional contract, we would probably decide that we had given them enough of our time and move on. As Nick mentions below, the contractors reputation is the one on the line. They have every reason to do right by you. The crooks of the world generally don't have a reputation to stand on, and as a customer it is your job to research who you are hiring. If you can't find anything about them, they probably aren't who you want to be dealing with. If they ask for money upfront, they probably aren't running a stable outfit. We never take a penny upfront. We collect when the job is fully complete even when we are working on weeks long projects.
Needless to say, the size of your bathroom will have a large say in your bathroom remodeling cost. Unfortunately, some smaller bathrooms take up a minimal 24sf. Replacing tile with hardwood will certainly increase your bathroom remodel cost, but it would not hurt as much if your bathroom was the more standard 50sf. Pine flooring can cost as much as $25/sf.
What activities will be done in the various parts of the room? For example, will you require a place to sit and apply makeup? Will the room also house laundry facilities? What activities can be done in a shared space, and which require a private area? Do you prefer separate shower and bath areas? Would you like a tub that accommodates more than one person? Do you want the water closet in its own compartment?
Everyone wants to save money, but when you start by questioning material costs or markups it can indicate that you may be under budgeting for the project, or will question every choice the contractor makes in the hopes of saving $100. Time is money and when you have a customer who may cause interruptions because they want to buy something themselves to avoid "markup" it can cause major delays. Many times a customer ends up getting the wrong material anyway. This again slows down a contractor that may already be too busy.
There are so many beautiful things to notice about this bathroom that it's hard to know where to start. The concrete sink? The wallpaper? The sconce lighting? The tarnished mirror on the door, reflected in the main mirror? The barely-there ultra-modern faucets? Whatever you notice first, though, you can't but admit that this space is a masterpiece.
The prices you quote do not come close to the prices paid in Chicago. Much depends on the cost of labor and whether the unit is in a high rise. The cost of a licensed plumber to do the simplest task can easily be more than $1000 and often is twice that. Labor has also skyrocketed this year in Chicago due to immigration policy. in addition, any changes in locations in a bathroom, turning a shower into a built in and converting the tub to shower, dramatically raise prices.
The remodel is needed due to water leakage from the tub surround into the wall cavity. I recommended she get an estimate of extra costs that cannot be foreseen until demolition occurs but would be entailed if the contractor has to do any structural work like putting in new studs and or has to install new insulation. I urged her to get at least an upper ceiling estimate before work begins lest the contractor make her an offer she can't refuse once the room is gutted. I urged her to be flexible on any adjustment to the estimate that can be made only after demolition begins. But I told her to insist that the rest of the estimate be binding. No surprises.

Remodeling your bathroom might seem like a complex task, but proper planning can help you get the look and feel you want for your home. Use this guide to learn more about the benefits of remodeling your powder room, guest bathroom or master bathroom space. Typically, bathroom remodels start at $5,000 and can vary based on the size of your room and the products you choose to update.
If you are just updating a bathroom, you will probably not need plumbing or electrical work. Since this article is referenced to a small bathroom, the costs here are way too high for labor unless you are in Manhattan. $9k for general labor is insane. A small bathroom should cost you $1-2k labor for reframing, concrete board, tile, toilet, vanity and accessories install. Texture and paint should be another $400-600 tops for a SMALL bathroom.
When you use a bold accessory like an animal skin, you need to make sure that it isn't lost in a bunch of other decor elements. This bathroom uses its neutral, modern design to really give space to the zebra skin rug here. And the great thing about this kind of design is that you can change this one decor element as often as you wish, without having to spend thousands remodeling every time.
For yourself, having fresh flowers in the planned new bathroom is small thing that can brighten every morning. Lightening candles in the planned new bathroom is also a simple aspect whenever you get into the room feeling so tired. Taking a bath with dimly-lighted candles will hopefully put your minds at rest, brings calmness to your head thus feels so fresh after that.
I have a miserably small master bath with a particle board subfloor (house built 1969), so I must guy it. I bought toilet made for small bathrooms, and plan to pull the cabinet sink, replace with pedestal, raise storage like lighted bulkhead, demolish tile, and widen doorway from 28" to 32". I might gain 6" from tile removal alone, plus but another 6" on entrance with cabinet sink removal. Since large expense is in demolition, I could do that. But, install showers is tricky given the drain leveling so I'll hire a pro for that. Question: gutting, updating and repairing master bath is necessary, but to what extent should I go i, terms of resizing, which would entail bumping out wall into adjoining small room, which then adds expense of finishing that where window placement restricts encroachment. It's a nice older brick house that I bought before I realized the made of lapses and oversights by the home inspector (who also is a local top police official in a town with highly subjective law enforcement). I need to fix, list, well and leave. Any thoughts (and prayers much appreciated).

If redesigning a bathroom sounds a little bit too much for you then consider executing remodel bathroom ideas on a budget instead. The terms don’t necessarily require you doing a lot of changes in the bathroom that will make spend more money. Implementing remodel bathroom ideas on a budget makes you think creatively on what changes that you can make in the bathroom without you spending too much money.
There are so many beautiful things to notice about this bathroom that it's hard to know where to start. The concrete sink? The wallpaper? The sconce lighting? The tarnished mirror on the door, reflected in the main mirror? The barely-there ultra-modern faucets? Whatever you notice first, though, you can't but admit that this space is a masterpiece.
On the other hand, accompanying children while taking a bath is necessary as part of their learning that is necessary as they grow. Here, you can teach them recognizing their private body parts and how to protect them from strangers’ bad initiatives. One of the ways of making the kids comfortable learning about these all is by doing it in a cool, joyful tone bathroom.
Now, we can jump into factors you can and should control throughout this adventure. No matter what house project you're undertaking, whether it be DIY or not, you need to have a budget. Before the project begins, you need to have a range, if not know exactly, of what you can spend on every little aspect. That means setting a number for your new cabinet hardware, shower head, shower stall, glass shower door or even material delivery and sticking to it.
A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away.
Buying a new toilet might not be exciting, but it is necessary during most bathroom remodels. The major expense here, as you might guess, will be the price of the toilet itself. If you can deliver the toilet to your home by yourself, then the installation cost will be minimal. On average, the cost of a new toilet, as well as installation, comes in between $360 and $492.
When it comes to cabinet installation, the overall cost depends on two key factors: materials and DIY or professional installation. Needless to say, if you use basic materials or stock cabinets over custom cabinets and higher-end materials, the overall cost will be less. In fact, custom cabinets can cost as much as $500 more per cabinet. If you’re installing more than five cabinets, that price difference really comes into play. Nonetheless, if you hire a contractor, expect to pay roughly $4,000 for the entire cabinet project.
The average cost to gut and demolish a bathroom is $400 to $2,000. Prices depend on the room size, type of materials, which fixtures are being removed, if walls are being demolished, and if any damage is found in the subflooring or inner wall structure. You can DIY to save money, but hire a professional to inspect your electrical wiring and plumbing.
×