What we refer as decorative items in this point are like flowers, candles, jars to put toys for children. You don’t need to purchase them all. Sometimes you only need to replace the instance to the planned new bathroom. You can put some toys from the children’ rooms to the planned new bathroom. This is a small idea to make your children feeling relaxed while taking a bath.
If you are just updating a bathroom, you will probably not need plumbing or electrical work. Since this article is referenced to a small bathroom, the costs here are way too high for labor unless you are in Manhattan. $9k for general labor is insane. A small bathroom should cost you $1-2k labor for reframing, concrete board, tile, toilet, vanity and accessories install. Texture and paint should be another $400-600 tops for a SMALL bathroom.
I can't even get anyone to look and give an estimate to complete a bathroom remodel- just the bathtub/shower part has to be done as the last person who was doing it died- the rest is complete and have all the items and materials already and paid for. once they hear that they are no longer intrested- what do they expect? me to let them rip out what was already done and repay and redone everything all over again so they get more money? and throw out brand new imported Travertine and Spanish tile?
The remodel is needed due to water leakage from the tub surround into the wall cavity. I recommended she get an estimate of extra costs that cannot be foreseen until demolition occurs but would be entailed if the contractor has to do any structural work like putting in new studs and or has to install new insulation. I urged her to get at least an upper ceiling estimate before work begins lest the contractor make her an offer she can't refuse once the room is gutted. I urged her to be flexible on any adjustment to the estimate that can be made only after demolition begins. But I told her to insist that the rest of the estimate be binding. No surprises.
The average bathroom remodel costs $10,446 Most homeowners spend between $5,977 and $14,926. You can spend as little as $3,500 to $7,000 updating the essentials in a small or medium-sized bathroom. On a large or master bath, you could spend $25,000 or more. Labor averages 50 percent of the total project price at about $65 per hour. Expect pricing to vary regionally up to 20 percent due mainly to labor. Material prices stay roughly the same across the country.
We'll take a deeper dive into current bathroom trends later on, but one such is adding modern metallic features. Luckily, updating your hardware is an effortless way to add visual interest and style to any room. However, if you prefer standard hardware and don’t plan on selling anytime soon, just know that you have to live with the update. Don’t add something if you’re going to be miserable using it. While it could bring in more money down the line, the update is simply not worth it.
The more luxurious the materials for a bathroom remodeling project, the higher your budget will be. Using marble for your counters, custom cabinetry or handpainted ceramic tiles for your new shower walls in the master bathroom will look terrific. But it will also raise your material costs considerably more than installing a laminate countertop and low-end or mid-range tiles.

As you might imagine, I once had to sue a contractor. He demanded payments up front during different stages of work replacing a roof and front porch on my house. When he wanted to cheap out and use inferior materials, i insisted he do the job to specifications I had provided to him in writing beforehand. He walked away from the job, half completed, and I had to hire someone else to finish it. I recovered most, but not all, of the money he had stolen.
I have been trying to find an honest contractor to do 1) tar roof vent pipes on a good roof 2) remodel my small 6'x8' bathroom. I was so shocked at what these 'devil people' came up with. The roof guy said he wants $1100 to repair some caulking around vent pipes and fix 6 nails that popped. I told him to try somewhere else and bough my own 24 foot ladder!! The bathroom contractors were worse. I had 3 estimates - first guy wanted already $500 just to come up with a design and it was NOT REFUNDABLE if we did not go with him. I showed him the door. THe next guy asked us to come to his showroom and he was not prepared at all. He did not know how to use the computer to show us details of his/our ideas, but came with a breakdown of items in the bathroom we could buy. He then came ups with a price of $25000!! After doing research, I see such a small bathroom with simple tile and small vanity, new toilet and replace already standing shower with tile and glass door cost max. $18000 in southern California where people earn double in Virginia. This $18000 makeover was absolutely gorgeous and in a huge bathroom with tub, shower and dressing room!! The third contractor came up with the price of $17,000. This was still way over what it should cost because the bathroom is SO SMALL that two people can not fit in there. What is happening to this USA? Because of the crisis back in 2008/2009, these contractors have all become ripoff artists and make the world what it is today.....how about honesty and kindness. This behavior is a vicious circle and will come back to all one day. Beware.
20% labor price ---out of the question----I'm a Building Contractor, If you are totally remodeling a bathroom, where is the cost for demo of existing???? Demo can easily run an extra 10%- factors: 1) Age of existing---many factors here to adjust price, 2) Accessibility ---Getting materials out of and to the bathroom, and protecting present surroundings of owner. 3) Cost to dispose of debris 4) Where is the Contractor's O & P ???
As you might imagine, I once had to sue a contractor. He demanded payments up front during different stages of work replacing a roof and front porch on my house. When he wanted to cheap out and use inferior materials, i insisted he do the job to specifications I had provided to him in writing beforehand. He walked away from the job, half completed, and I had to hire someone else to finish it. I recovered most, but not all, of the money he had stolen.
The Home Depot is a great place to buy your bathroom essentials and remodeling materials. We also provide top-rated design and installation services for homeowners across America. Besides undergoing full background checks, our hand-selected remodeling experts are local, licensed and insured. The Home Depot also offers a great selection of flexible finance options.
×
bathroom remodel homewyse bathroom remodel without permit | bathroom remodeling ideas photos bathroom remodel reviews

The prices you quote do not come close to the prices paid in Chicago. Much depends on the cost of labor and whether the unit is in a high rise. The cost of a licensed plumber to do the simplest task can easily be more than $1000 and often is twice that. Labor has also skyrocketed this year in Chicago due to immigration policy. in addition, any changes in locations in a bathroom, turning a shower into a built in and converting the tub to shower, dramatically raise prices.
A sun tube, also known as a solar tube, is an ingenious device that you install between the attic rafters. These flexible tubes range from about 10 inches in diameter up to more than 20 inches, and they funnel natural sunlight down to your bathroom from a small opening cut into the roof. Sun tubes cost between $200 and $400, compared to the $1,500 you'd likely spend on a double-paned window or skylight.

Yeah, I feel your pain. I'm in Alabama, one of the lowest income states in the country, and I got a quote from a "big box" hardware store here. $39,000 -- to remodel a 9 x 12 bathroom. I won't go into the details but I'll tell you that the estimate included $3600 for electrical work. Uhh, we are simply switching out 2 'regular' outlets and putting in $20-dollar GFI outlets. The wiring is fine (I know because I've been in the wall before). So don't go to the "big box" stores unless you want the highest possible estimate (oh, yeah ... I had to pay for the estimate as well).
Everyone wants to save money, but when you start by questioning material costs or markups it can indicate that you may be under budgeting for the project, or will question every choice the contractor makes in the hopes of saving $100. Time is money and when you have a customer who may cause interruptions because they want to buy something themselves to avoid "markup" it can cause major delays. Many times a customer ends up getting the wrong material anyway. This again slows down a contractor that may already be too busy.
My bathroom is about 8X8. Received a quote for 17,000.00 just for labor only. Granted they would be gutting entire bathroom. Also plumbing fixtures will be in same place accept toilet moved 4"inches to the left. Air tub will replace current cast iron tub -no separate shower. My material cost will be about 9500.00 . They want half of the labor cost upfront ($8500.00 Demo will be done in one day and I must pay for dumpster. My home is worth about $200K This bathroom will cost a total of approximately $26K Is this a reasonable quote and I this too much overall to spend based on home resale?
Having an onsite dumpster should be your responsibility if it is something you are going to demand. They aren't cheap. Make suggestions or request a dumpster be included in the bid, but I would never start demanding anything when requesting proposals. They may have their own suggestions. We own a dump trailer and we bring it during demolition to handle the large debris. We have the trailer to avoid having to rent a dumpster on the job. If asked we can share this information, but if you require a dumpster instead we would have to take the time and research getting a dumpster to your house and add in costs we aren't accustomed to adding. That takes time and effort we may just not want to expend to give you a quote. Good contractors are generally very busy.
20% labor price ---out of the question----I'm a Building Contractor, If you are totally remodeling a bathroom, where is the cost for demo of existing???? Demo can easily run an extra 10%- factors: 1) Age of existing---many factors here to adjust price, 2) Accessibility ---Getting materials out of and to the bathroom, and protecting present surroundings of owner. 3) Cost to dispose of debris 4) Where is the Contractor's O & P ???
As a contractor I can tell you that most reputable contractors probably don't need your job, and if you make things too complicated or troublesome, they will move on to other jobs that don't throw up red flags. Much of what you ask for here is reasonable, but bringing a second contract into the equation can set of some alarms that you may be a difficult customer to work with or even a litigiously minded person who is likely to try and bring a lawsuit whether deserved or not. Anything you want covered should be in the original contract.
On the other hand, accompanying children while taking a bath is necessary as part of their learning that is necessary as they grow. Here, you can teach them recognizing their private body parts and how to protect them from strangers’ bad initiatives. One of the ways of making the kids comfortable learning about these all is by doing it in a cool, joyful tone bathroom.

This estimate for a 2019 Typical Bathroom Remodel is derived from the unit cost method summarized in the American Institute of Architects Detailed Cost Estimating - Best Practices. This approach is used by professional designers, contractors, engineers and estimators and uses current wages, material costs, worker productivity benchmarks, supervisory overhead and markup rates.
Yeah, I feel your pain. I'm in Alabama, one of the lowest income states in the country, and I got a quote from a "big box" hardware store here. $39,000 -- to remodel a 9 x 12 bathroom. I won't go into the details but I'll tell you that the estimate included $3600 for electrical work. Uhh, we are simply switching out 2 'regular' outlets and putting in $20-dollar GFI outlets. The wiring is fine (I know because I've been in the wall before). So don't go to the "big box" stores unless you want the highest possible estimate (oh, yeah ... I had to pay for the estimate as well).
I agree with everything you said. I think the trick is to convey those concerns when discussing what work will be needed. Everyone will have concerns but if you come across as too needy or pushy they may think you will be a pain in the butt homeowner. I have seen this before where you have to come back 3 or 4 times for something not dealing with the work, but you are trying to be polite and helpful for business. Word of mouth is the best way to get more buisness, in my opinion.
20% labor price ---out of the question----I'm a Building Contractor, If you are totally remodeling a bathroom, where is the cost for demo of existing???? Demo can easily run an extra 10%- factors: 1) Age of existing---many factors here to adjust price, 2) Accessibility ---Getting materials out of and to the bathroom, and protecting present surroundings of owner. 3) Cost to dispose of debris 4) Where is the Contractor's O & P ???
While it's easy to replace a light or faucet at a later date, you should have your contractor do the larger tasks at the same time. If you plan to replace the tub and install tile floor, it's best to do that all at once. You may save on labor charges if they can do a few tasks in one day instead of doing these tasks on separate days a few months apart.

Installing a new bathtub is one of the more complicated and expensive projects involved in a bathroom remodel. Not only will you have to purchase the tub itself, you also need to install surrounds and have a plumber come by for the installation work. If you're just replacing the tub, and the surround can stay, your price will be lower than average. If you're having a customized surround built, expect to pay around $3,160.


I have a miserably small master bath with a particle board subfloor (house built 1969), so I must guy it. I bought toilet made for small bathrooms, and plan to pull the cabinet sink, replace with pedestal, raise storage like lighted bulkhead, demolish tile, and widen doorway from 28" to 32". I might gain 6" from tile removal alone, plus but another 6" on entrance with cabinet sink removal. Since large expense is in demolition, I could do that. But, install showers is tricky given the drain leveling so I'll hire a pro for that. Question: gutting, updating and repairing master bath is necessary, but to what extent should I go i, terms of resizing, which would entail bumping out wall into adjoining small room, which then adds expense of finishing that where window placement restricts encroachment. It's a nice older brick house that I bought before I realized the made of lapses and oversights by the home inspector (who also is a local top police official in a town with highly subjective law enforcement). I need to fix, list, well and leave. Any thoughts (and prayers much appreciated).
×