I’m mostly done with a renovation on a small bathroom with a tub. Once I knew what was staying what was going that made figureing the costs much easier. Estimated costs for everything I would need for almost a year. I budgetted about $1,800. I figure I have another $500 in expenses to finish. Saved alot on doing most of the work and hiring for the electrical and plummbing. Hint, if you make the problem assesible it makes the job cheaper.
I just renovated a 6X12 bathroom. Old cast iron tub removed. Removed and saved existing vanity and vanity top. Removed the toilet and replaced the existing rotten flooring and added on to the existing partially rotten floor joist. Removed the drywall and tile from around the old tub. After the new flooring was in I had to modify the existing plumbing to accommodate the new tub and shower surround. The hot and cold water lines had to be raised to fit the surround because the new tub is taller and the drains had to be installed and moved to fit the new tub. Drywall was finished and painted. New faucets,New tub,Tub Surround, and flooring materials were purchased by the home owner. Labor cost was 4,584.00
I have a miserably small master bath with a particle board subfloor (house built 1969), so I must guy it. I bought toilet made for small bathrooms, and plan to pull the cabinet sink, replace with pedestal, raise storage like lighted bulkhead, demolish tile, and widen doorway from 28" to 32". I might gain 6" from tile removal alone, plus but another 6" on entrance with cabinet sink removal. Since large expense is in demolition, I could do that. But, install showers is tricky given the drain leveling so I'll hire a pro for that. Question: gutting, updating and repairing master bath is necessary, but to what extent should I go i, terms of resizing, which would entail bumping out wall into adjoining small room, which then adds expense of finishing that where window placement restricts encroachment. It's a nice older brick house that I bought before I realized the made of lapses and oversights by the home inspector (who also is a local top police official in a town with highly subjective law enforcement). I need to fix, list, well and leave. Any thoughts (and prayers much appreciated).

If you were gutting your entire bathroom, contractors and experts say showers should account for one-third of the total remodeling cost. Furthermore, unlike your bathroom flooring, there are a few elements in play when considering a shower remodel. After all, you have to decide on a shower head, shower door and shower stall. All in all, a new shower typically costs approximately $2,800.
If you want a small addition that can improve your bathroom in a big way, consider buying and installing a bath fan. This will reduce humidity in the room, eliminate odors and remove moisture from the air. If you already have a bath fan and the wiring is in place, then you can expect to pay a very reasonable $150 for the installation work. If there is no current space for the fan, however, your cost might be closer to $800.
I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.
Yeah, I feel your pain. I'm in Alabama, one of the lowest income states in the country, and I got a quote from a "big box" hardware store here. $39,000 -- to remodel a 9 x 12 bathroom. I won't go into the details but I'll tell you that the estimate included $3600 for electrical work. Uhh, we are simply switching out 2 'regular' outlets and putting in $20-dollar GFI outlets. The wiring is fine (I know because I've been in the wall before). So don't go to the "big box" stores unless you want the highest possible estimate (oh, yeah ... I had to pay for the estimate as well).
Bathroom remodels provide 60 to 70 percent resale returns as a home improvement project. However, this project isn’t cheap. It is essential to plan your remodeling ideas ahead of time. Then, hire a remodeling contractor for the job. Ask questions, set realistic expectations, get accurate cost estimates and budgeting from the start. Also spend time learning how to work with a bathroom contractor.
Depends who is doing it – If you hire a ” Contractor ” who is a Jack of all trades then it should in fact cost less but the trades that the individual excels in will stand out and the ones he does not will suffer. In my professional opinion this is a bad way to go due the the above mentioned and also you are subject to one individuals time line ( other jobs ) and illness are other factors to consider. A professional company that brings in professional trades people for each task ( plumbing, tile , granite , electrical ) should bring you an outstanding outcome. Depending on the size of the project, the work involved and items selected you should pay between $11,000 to $16,000 fo a small to mid sized bathroom to include the wet area ( tub, shower ) floors, vanity, sink, plubing and fixtures, electrical mirrors and accessories . . . .
What activities will be done in the various parts of the room? For example, will you require a place to sit and apply makeup? Will the room also house laundry facilities? What activities can be done in a shared space, and which require a private area? Do you prefer separate shower and bath areas? Would you like a tub that accommodates more than one person? Do you want the water closet in its own compartment?

Yeah, I feel your pain. I'm in Alabama, one of the lowest income states in the country, and I got a quote from a "big box" hardware store here. $39,000 -- to remodel a 9 x 12 bathroom. I won't go into the details but I'll tell you that the estimate included $3600 for electrical work. Uhh, we are simply switching out 2 'regular' outlets and putting in $20-dollar GFI outlets. The wiring is fine (I know because I've been in the wall before). So don't go to the "big box" stores unless you want the highest possible estimate (oh, yeah ... I had to pay for the estimate as well).
Depends who is doing it – If you hire a ” Contractor ” who is a Jack of all trades then it should in fact cost less but the trades that the individual excels in will stand out and the ones he does not will suffer. In my professional opinion this is a bad way to go due the the above mentioned and also you are subject to one individuals time line ( other jobs ) and illness are other factors to consider. A professional company that brings in professional trades people for each task ( plumbing, tile , granite , electrical ) should bring you an outstanding outcome. Depending on the size of the project, the work involved and items selected you should pay between $11,000 to $16,000 fo a small to mid sized bathroom to include the wet area ( tub, shower ) floors, vanity, sink, plubing and fixtures, electrical mirrors and accessories . . . .
Hiring a plumber and skilled workers for important tasks is a must to make the planned new bathroom well-fit. Other than that, you can actually save money if you do minor tasks as mentioned before. In addition to those assignments, you can paint the newly-redesigned bathroom. You can work together with your wife to decorate it. Or you can even invite your children to select which items to be put in it.
There are so many beautiful things to notice about this bathroom that it's hard to know where to start. The concrete sink? The wallpaper? The sconce lighting? The tarnished mirror on the door, reflected in the main mirror? The barely-there ultra-modern faucets? Whatever you notice first, though, you can't but admit that this space is a masterpiece.
And then the apples to bananas procedure of reviewing non-like proposals is just as frustrating. Some bring everything. From the paint to the tile to the fixtures and cabinetry. Others point you in you’re own direction for each of these and expect you to know what questions to ask when buying never-before, behind the scenes purchases that are required for a bathroom remodel. And you’re expected to review the costs a la carte vs as a package and come to a whole conclusion as soon as possible ‘cause if you want the remodel done in 5 months, we have to start in 3 and we’re booked for the next 6...wait, what??!?!?
×