If you are just updating a bathroom, you will probably not need plumbing or electrical work. Since this article is referenced to a small bathroom, the costs here are way too high for labor unless you are in Manhattan. $9k for general labor is insane. A small bathroom should cost you $1-2k labor for reframing, concrete board, tile, toilet, vanity and accessories install. Texture and paint should be another $400-600 tops for a SMALL bathroom.

A punitive approach to what could be unforseen and atypical delays may be a bad idea. I would suggest offering a bonus for the job being completed early rather than a penalty for it being delayed. If material is ordered, we can't make it arrive faster if something delays the shipment. We recently ordered a bathtub requested by a customer. It was promised by our supplier for a Wednesday delivery. Bad weather hit Texas and it just didn't leave the warehouse until the following Monday. It blew up our schedule for the project and it wasn't anyone's fault or mistake. If we have an employee critical to the project get sick or injured, we may not be able to get things done as originally scheduled. Jobs can get off schedule for a lot of reasons outside the contractor's control. Charging them for those things is likely to turn them away.

I just renovated a 6X12 bathroom. Old cast iron tub removed. Removed and saved existing vanity and vanity top. Removed the toilet and replaced the existing rotten flooring and added on to the existing partially rotten floor joist. Removed the drywall and tile from around the old tub. After the new flooring was in I had to modify the existing plumbing to accommodate the new tub and shower surround. The hot and cold water lines had to be raised to fit the surround because the new tub is taller and the drains had to be installed and moved to fit the new tub. Drywall was finished and painted. New faucets,New tub,Tub Surround, and flooring materials were purchased by the home owner. Labor cost was 4,584.00
I can't even get anyone to look and give an estimate to complete a bathroom remodel- just the bathtub/shower part has to be done as the last person who was doing it died- the rest is complete and have all the items and materials already and paid for. once they hear that they are no longer intrested- what do they expect? me to let them rip out what was already done and repay and redone everything all over again so they get more money? and throw out brand new imported Travertine and Spanish tile?
It's totally legitimate for a professional to charge you for a design, at least in some situations. If the contractor has a book of ready-made designs and just pulled one out to show you, then you're right that s/he shouldn't charge you. But if someone does a design that conforms to your room's dimensions, with the features that you want, then that person has invested time in creating a work product. Some contractors and architects think that's just the cost of doing business, but many others consider that their time is worth something, and they charge for it. You just need to let contractors know that you're not looking for that kind of custom work, and not willing to pay for it.

My suggestion is when talking to contractor be subtle and ask your questions. Ask if he/she will have a dumpster or trailer to haul away debris. If the don't get dumpster or have a trailer then you probably don't want them to work on your home. Tell them your concern with the only toilet in the house. Unless it is not safe I have always reinstalled the toilet so it could be used at night. A good contractor will work with you in anyway possible because you are the key to more business.
The remodel is needed due to water leakage from the tub surround into the wall cavity. I recommended she get an estimate of extra costs that cannot be foreseen until demolition occurs but would be entailed if the contractor has to do any structural work like putting in new studs and or has to install new insulation. I urged her to get at least an upper ceiling estimate before work begins lest the contractor make her an offer she can't refuse once the room is gutted. I urged her to be flexible on any adjustment to the estimate that can be made only after demolition begins. But I told her to insist that the rest of the estimate be binding. No surprises.
The materials you choose for your new and improved bathroom will have the biggest effect on the final price. While 10sf of laminate may not be a lot, 25sq of marble can run as high as $2,500. Furthermore, if you decide to install any luxurious additions, such as a unique light fixture, Jacuzzi or heated bathroom floors, the total bathroom remodeling cost will rise.
Depends who is doing it – If you hire a ” Contractor ” who is a Jack of all trades then it should in fact cost less but the trades that the individual excels in will stand out and the ones he does not will suffer. In my professional opinion this is a bad way to go due the the above mentioned and also you are subject to one individuals time line ( other jobs ) and illness are other factors to consider. A professional company that brings in professional trades people for each task ( plumbing, tile , granite , electrical ) should bring you an outstanding outcome. Depending on the size of the project, the work involved and items selected you should pay between $11,000 to $16,000 fo a small to mid sized bathroom to include the wet area ( tub, shower ) floors, vanity, sink, plubing and fixtures, electrical mirrors and accessories . . . .
What activities will be done in the various parts of the room? For example, will you require a place to sit and apply makeup? Will the room also house laundry facilities? What activities can be done in a shared space, and which require a private area? Do you prefer separate shower and bath areas? Would you like a tub that accommodates more than one person? Do you want the water closet in its own compartment?
I have a miserably small master bath with a particle board subfloor (house built 1969), so I must guy it. I bought toilet made for small bathrooms, and plan to pull the cabinet sink, replace with pedestal, raise storage like lighted bulkhead, demolish tile, and widen doorway from 28" to 32". I might gain 6" from tile removal alone, plus but another 6" on entrance with cabinet sink removal. Since large expense is in demolition, I could do that. But, install showers is tricky given the drain leveling so I'll hire a pro for that. Question: gutting, updating and repairing master bath is necessary, but to what extent should I go i, terms of resizing, which would entail bumping out wall into adjoining small room, which then adds expense of finishing that where window placement restricts encroachment. It's a nice older brick house that I bought before I realized the made of lapses and oversights by the home inspector (who also is a local top police official in a town with highly subjective law enforcement). I need to fix, list, well and leave. Any thoughts (and prayers much appreciated).

The more luxurious the materials for a bathroom remodeling project, the higher your budget will be. Using marble for your counters, custom cabinetry or handpainted ceramic tiles for your new shower walls in the master bathroom will look terrific. But it will also raise your material costs considerably more than installing a laminate countertop and low-end or mid-range tiles.

×