Wall and Floor Tile: Ceramic, porcelain and natural stone are popular picks for floor tile in bathrooms. Materials will be the deciding factor here, but natural stone often costs more to install because it is difficult to cut and place. From natural stone and classic ceramic to glass and mosaic styles that mimic natural materials, wall tile options vary.
As the home owner, I am providing about $8,000 in materials. This includes the cabinetry, fixtures, faucets, countertops, lighting, toilet, glass in-line shower door and tile. Received two quotes. One contractor wants $25,000 to demo the bathroom, convert the existing tub to a tiled walk-in shower, tile the floor, and install my materials. The other wants $27,000. Using the previously mentioned 60/40 labor to material rate, I would be paying more than double for labor...that's insane. Some contractor's need a reality check.
Unless specified in Project Options list, this typical bathroom remodel estimate does NOT include costs for relocating, repairing, modifying or enhancing existing structural, HVAC, electrical and plumbing systems. Estimate common structural and system modification costs with the Room Modifications Cost estimator or the Home Addition Cost estimator.
Top that with contractors that don’t even provide a drawings, plans or official documentation of their intent and we can see where their seemingly in control of the market. Their swagger is even more overloaded when they’re excited to come view your home yet can’t call you back week after week months later because they’re too busy to even consider your meager $30-50k one-room remodel.
The materials you choose for your new and improved bathroom will have the biggest effect on the final price. While 10sf of laminate may not be a lot, 25sq of marble can run as high as $2,500. Furthermore, if you decide to install any luxurious additions, such as a unique light fixture, Jacuzzi or heated bathroom floors, the total bathroom remodeling cost will rise.
There are so many beautiful things to notice about this bathroom that it's hard to know where to start. The concrete sink? The wallpaper? The sconce lighting? The tarnished mirror on the door, reflected in the main mirror? The barely-there ultra-modern faucets? Whatever you notice first, though, you can't but admit that this space is a masterpiece.
The remodel is needed due to water leakage from the tub surround into the wall cavity. I recommended she get an estimate of extra costs that cannot be foreseen until demolition occurs but would be entailed if the contractor has to do any structural work like putting in new studs and or has to install new insulation. I urged her to get at least an upper ceiling estimate before work begins lest the contractor make her an offer she can't refuse once the room is gutted. I urged her to be flexible on any adjustment to the estimate that can be made only after demolition begins. But I told her to insist that the rest of the estimate be binding. No surprises.
The things that may scare someone away is agreeing on cost and deadline before they could know what they are getting into. The last thing they want is for this job to cost them money. I think a good way to talk about deadline and reimbursement it to tell them your concerns. Be honest, tell them it is costing you time and money having to shower somewhere else. Ask them if it would be possible to be reimbursed if it goes over deadline. If they agree put it in contract. What I think the trick is, is to bring up the topic and let it be their idea or have them agree to an idea rather than coming to them with something seeming like demands. Offer a drink or something, seem friendly and easy to work with. Kindness goes a long way. Their reputation is on the line not yours.

I have a new home plastic/fiberglass shower stall with a glass door and side panel. Two side are the plastic and it is probably 8' tall. I do not want to enlarge it at all. I want to just replace. It is like an inset that was there when we built the house. Not fancy. It is a white/cream color and I would just like something nicer to replace it. Anyone intrested in the Spring, Texas area.
I’m in the middle of a small bathroom remodel. Shower only-no tub. I thought I was ready for this, but so many things have come up I didn’t count on. I paid $5000 for all supplies and in stock fixtures at Lowes–just basic stuff. I did have to order a shower kit because the builder thought it would save some labor time. It was high–$3200. The builder charges $50 an hour (includes him and his helper). He estimated his costs between 5 and 7 thousand. My house is 35 years old so he has had to do a lot of work to accommodate the new fixtures. I had an old lighted medicine cabinet so he had to rewire for the new lights. My vanity was too high so he had to move the electrical outlet. Because my attic above the shower had moisture in it, he had to vent the shower to the outside. He had to replace all the subflooring and a lot of the rotted insulation on the sides of the bathroom (leaky roof) . Anyway, it looks like my bathroom remodel is going to be around 10 or 11 thousand. I wish now I hadn’t ordered the shower kit with the fancy tile.
×