The prices you quote do not come close to the prices paid in Chicago. Much depends on the cost of labor and whether the unit is in a high rise. The cost of a licensed plumber to do the simplest task can easily be more than $1000 and often is twice that. Labor has also skyrocketed this year in Chicago due to immigration policy. in addition, any changes in locations in a bathroom, turning a shower into a built in and converting the tub to shower, dramatically raise prices.

I have a miserably small master bath with a particle board subfloor (house built 1969), so I must guy it. I bought toilet made for small bathrooms, and plan to pull the cabinet sink, replace with pedestal, raise storage like lighted bulkhead, demolish tile, and widen doorway from 28" to 32". I might gain 6" from tile removal alone, plus but another 6" on entrance with cabinet sink removal. Since large expense is in demolition, I could do that. But, install showers is tricky given the drain leveling so I'll hire a pro for that. Question: gutting, updating and repairing master bath is necessary, but to what extent should I go i, terms of resizing, which would entail bumping out wall into adjoining small room, which then adds expense of finishing that where window placement restricts encroachment. It's a nice older brick house that I bought before I realized the made of lapses and oversights by the home inspector (who also is a local top police official in a town with highly subjective law enforcement). I need to fix, list, well and leave. Any thoughts (and prayers much appreciated).
I have a miserably small master bath with a particle board subfloor (house built 1969), so I must guy it. I bought toilet made for small bathrooms, and plan to pull the cabinet sink, replace with pedestal, raise storage like lighted bulkhead, demolish tile, and widen doorway from 28" to 32". I might gain 6" from tile removal alone, plus but another 6" on entrance with cabinet sink removal. Since large expense is in demolition, I could do that. But, install showers is tricky given the drain leveling so I'll hire a pro for that. Question: gutting, updating and repairing master bath is necessary, but to what extent should I go i, terms of resizing, which would entail bumping out wall into adjoining small room, which then adds expense of finishing that where window placement restricts encroachment. It's a nice older brick house that I bought before I realized the made of lapses and oversights by the home inspector (who also is a local top police official in a town with highly subjective law enforcement). I need to fix, list, well and leave. Any thoughts (and prayers much appreciated).
I’m in the middle of a small bathroom remodel. Shower only-no tub. I thought I was ready for this, but so many things have come up I didn’t count on. I paid $5000 for all supplies and in stock fixtures at Lowes–just basic stuff. I did have to order a shower kit because the builder thought it would save some labor time. It was high–$3200. The builder charges $50 an hour (includes him and his helper). He estimated his costs between 5 and 7 thousand. My house is 35 years old so he has had to do a lot of work to accommodate the new fixtures. I had an old lighted medicine cabinet so he had to rewire for the new lights. My vanity was too high so he had to move the electrical outlet. Because my attic above the shower had moisture in it, he had to vent the shower to the outside. He had to replace all the subflooring and a lot of the rotted insulation on the sides of the bathroom (leaky roof) . Anyway, it looks like my bathroom remodel is going to be around 10 or 11 thousand. I wish now I hadn’t ordered the shower kit with the fancy tile.
It's totally legitimate for a professional to charge you for a design, at least in some situations. If the contractor has a book of ready-made designs and just pulled one out to show you, then you're right that s/he shouldn't charge you. But if someone does a design that conforms to your room's dimensions, with the features that you want, then that person has invested time in creating a work product. Some contractors and architects think that's just the cost of doing business, but many others consider that their time is worth something, and they charge for it. You just need to let contractors know that you're not looking for that kind of custom work, and not willing to pay for it.

What activities will be done in the various parts of the room? For example, will you require a place to sit and apply makeup? Will the room also house laundry facilities? What activities can be done in a shared space, and which require a private area? Do you prefer separate shower and bath areas? Would you like a tub that accommodates more than one person? Do you want the water closet in its own compartment?


And industry trends bear out this desire for bigger, or just better, master baths. According to the National Kitchen and Bath Association (NKBA) homeowners undertaking bathroom renovations are spending the most on master bathrooms with an average budget of $32,000 (including materials and labor). That’s more than twice what is spent on a powder room remodel. That average cost, however, is dependent upon a host of factors including the scope of the remodel, whether you are using luxury or standard fixtures, where you live and other considerations.

The prices you quote do not come close to the prices paid in Chicago. Much depends on the cost of labor and whether the unit is in a high rise. The cost of a licensed plumber to do the simplest task can easily be more than $1000 and often is twice that. Labor has also skyrocketed this year in Chicago due to immigration policy. in addition, any changes in locations in a bathroom, turning a shower into a built in and converting the tub to shower, dramatically raise prices.


Yeah, I feel your pain. I'm in Alabama, one of the lowest income states in the country, and I got a quote from a "big box" hardware store here. $39,000 -- to remodel a 9 x 12 bathroom. I won't go into the details but I'll tell you that the estimate included $3600 for electrical work. Uhh, we are simply switching out 2 'regular' outlets and putting in $20-dollar GFI outlets. The wiring is fine (I know because I've been in the wall before). So don't go to the "big box" stores unless you want the highest possible estimate (oh, yeah ... I had to pay for the estimate as well).
Now, we can jump into factors you can and should control throughout this adventure. No matter what house project you're undertaking, whether it be DIY or not, you need to have a budget. Before the project begins, you need to have a range, if not know exactly, of what you can spend on every little aspect. That means setting a number for your new cabinet hardware, shower head, shower stall, glass shower door or even material delivery and sticking to it.

What we refer as decorative items in this point are like flowers, candles, jars to put toys for children. You don’t need to purchase them all. Sometimes you only need to replace the instance to the planned new bathroom. You can put some toys from the children’ rooms to the planned new bathroom. This is a small idea to make your children feeling relaxed while taking a bath.
I have a new home plastic/fiberglass shower stall with a glass door and side panel. Two side are the plastic and it is probably 8' tall. I do not want to enlarge it at all. I want to just replace. It is like an inset that was there when we built the house. Not fancy. It is a white/cream color and I would just like something nicer to replace it. Anyone intrested in the Spring, Texas area.

If you want a small addition that can improve your bathroom in a big way, consider buying and installing a bath fan. This will reduce humidity in the room, eliminate odors and remove moisture from the air. If you already have a bath fan and the wiring is in place, then you can expect to pay a very reasonable $150 for the installation work. If there is no current space for the fan, however, your cost might be closer to $800.
I acted as general contractor and did all my own demo to remodel my 6x8 bathroom. I hired subs individually to do most of the work - an electrician, a plumber, a drywall guy and a tile guy. I painted the walls and the ceiling. I replaced everything except the cast iron tub. Materials and fixtures cost around $2000 and labor was about $3000. My subs had no problem with me supplying the materials, because I discussed their job scope in advance. This project took 6 months but I did have another full bath to use in the mean time.
It's totally legitimate for a professional to charge you for a design, at least in some situations. If the contractor has a book of ready-made designs and just pulled one out to show you, then you're right that s/he shouldn't charge you. But if someone does a design that conforms to your room's dimensions, with the features that you want, then that person has invested time in creating a work product. Some contractors and architects think that's just the cost of doing business, but many others consider that their time is worth something, and they charge for it. You just need to let contractors know that you're not looking for that kind of custom work, and not willing to pay for it.
The average cost to gut and demolish a bathroom is $400 to $2,000. Prices depend on the room size, type of materials, which fixtures are being removed, if walls are being demolished, and if any damage is found in the subflooring or inner wall structure. You can DIY to save money, but hire a professional to inspect your electrical wiring and plumbing.
My suggestion is when talking to contractor be subtle and ask your questions. Ask if he/she will have a dumpster or trailer to haul away debris. If the don't get dumpster or have a trailer then you probably don't want them to work on your home. Tell them your concern with the only toilet in the house. Unless it is not safe I have always reinstalled the toilet so it could be used at night. A good contractor will work with you in anyway possible because you are the key to more business.
Wall and Floor Tile: Ceramic, porcelain and natural stone are popular picks for floor tile in bathrooms. Materials will be the deciding factor here, but natural stone often costs more to install because it is difficult to cut and place. From natural stone and classic ceramic to glass and mosaic styles that mimic natural materials, wall tile options vary.

According to Remodeling Magazine’s 2019 Cost Vs. Value report an upscale bathroom remodel can cost, on national average, $64,743. That type of upscale remodel would generally expand the existing bath footprint by more than 50 percent and include details such as in-floor heating, high-end faucet, a shower body-spray fixture, a frameless glass enclosure, a freestanding soaking tub, stone countertops and two sinks, two mirrored medicine cabinets with lighting, a separate commode area and a humidity-controlling exhaust fan, general and spot lighting and wall cabinets.

Installing a new bathtub is one of the more complicated and expensive projects involved in a bathroom remodel. Not only will you have to purchase the tub itself, you also need to install surrounds and have a plumber come by for the installation work. If you're just replacing the tub, and the surround can stay, your price will be lower than average. If you're having a customized surround built, expect to pay around $3,160.
I’m in the middle of a small bathroom remodel. Shower only-no tub. I thought I was ready for this, but so many things have come up I didn’t count on. I paid $5000 for all supplies and in stock fixtures at Lowes–just basic stuff. I did have to order a shower kit because the builder thought it would save some labor time. It was high–$3200. The builder charges $50 an hour (includes him and his helper). He estimated his costs between 5 and 7 thousand. My house is 35 years old so he has had to do a lot of work to accommodate the new fixtures. I had an old lighted medicine cabinet so he had to rewire for the new lights. My vanity was too high so he had to move the electrical outlet. Because my attic above the shower had moisture in it, he had to vent the shower to the outside. He had to replace all the subflooring and a lot of the rotted insulation on the sides of the bathroom (leaky roof) . Anyway, it looks like my bathroom remodel is going to be around 10 or 11 thousand. I wish now I hadn’t ordered the shower kit with the fancy tile.
×